Manifesto Without a Party

Roads — Time to Be Logical

Britain's roads are deteriorating faster than councils can maintain them. The issue isn't just funding — it's the rules that dictate how the money can be used and who is accountable when roads fail.

The full chapter

Read the full text from the Manifesto Without A Party

Every point above is taken from the unabridged chapter below.

UK Roads — Time to Be Logical

The total annual road budget in 2026 is around £7.8 billion — with local road maintenance receiving £1.8 billion and national roads (maintenance and upgrades) receiving £6 billion. Most funding is locked into major upgrades, not day-to-day repairs. Only around 23% of the total budget can be used to fix local roads — the roads most people actually use. Councils cannot legally move upgrade funds into essential repairs, even when repairs are clearly the priority. 'Use it or lose it' rules mean unspent money disappears instead of being carried forward.

The current system produces predictable failures

  • Roads that do not need upgrading get upgraded anyway.

  • There is never enough funding to repair roads already in place.

  • Utilities and contractors dig up roads and leave short-term reinstatements that break down and become potholes.

  • Councils are forced to spend money quickly — even unwisely — to avoid losing next year's allocation.

1. Allow road budgets to be used logically

  • Councils must be able to direct funding to essential repairs first.

  • Unspent funds should carry over, not disappear at year-end.

  • Councils should not be penalised for planning sensibly — efficiency must be rewarded.

Benefits: faster improvement in road condition; lower long-term maintenance costs; fewer pothole related claims; better long-term planning.

2. Introduce a strong pothole liability system

A legally binding five-year guarantee on any section of road opened by a utility or contractor.

  • Mandatory before and after photos with GPS and timestamp logging.

  • Automatic assignment of responsibility.

  • Penalties for missed deadlines or failed repairs.

DfT Street Works Performance Statistics show reinstatement failure rates ranging from 2% to 63%, with an average around 9%. The Asphalt Industry Alliance identifies poor reinstatements as a major contributor to pothole formation.

3. Independent oversight that pays for itself

  • A specialist body runs the digital logging system, audits repairs, issues fines and tracks contractor performance.

  • Funded through permit fees and penalties — not council tax.

  • Consistent national standards and transparent accountability.

4. A public reporting system that actually works

  • A national website and app where anyone can report a pothole.

  • The system automatically identifies the responsible party, issues a repair deadline and requires photographic proof of completion.

  • Faster repairs, public visibility and reduced administrative burden on councils.

THE EVIDENCE

International research (OECD Infrastructure Maintenance Efficiency Studies; World Bank Road Asset Management Case Studies) shows 20–40% savings on road maintenance budgets when digital auditing, long-term responsibility and no loss budgeting are introduced.

Sources & References

All statistics and claims are backed by verifiable sources

  1. HM Treasury – Autumn Statement & Local Transport Funding

    £7.3bn for local road maintenance 2026–2030.

    https://www.gov.uk/government/publications/autumn-statement-2023

  2. DfT – Road Investment Strategy (RIS3)

    £24bn for national and local strategic roads 2026–2030.

    https://www.gov.uk/government/publications/road-investment-strategy-2

  3. National Audit Office – Maintaining Strategic Infrastructure

    Annual spending patterns and capital budget reallocation constraints.

    https://www.nao.org.uk

  4. DfT – Street Works Performance Statistics

    Reinstatement failure rates: 2–63%, average ~9%.

    https://www.gov.uk/government/collections/street-works-and-road-works

  5. Asphalt Industry Alliance – Annual ALARM Survey

    Poor reinstatements as major cause of pothole formation.

    https://www.asphaltuk.org/alarm-survey/

  6. OECD – Infrastructure Maintenance Efficiency Studies

    20–40% savings from digital auditing and long-term maintenance planning.

    https://www.oecd.org/governance/infrastructure

  7. World Bank – Road Asset Management Case Studies

    Improved outcomes when responsibility and inspection systems are enforced.

    https://www.worldbank.org/en/topic/transport

Newsletter

Stay in the loop

Get campaign updates, petition milestones, and ways to help — straight to your inbox. No spam, ever.

We respect your privacy. Unsubscribe anytime.